NewAI colleagues set up for your company, live in four weeks. On average, what we deploy saves €2.5M a year.€2.5M saved a year, on averageHow we deploy →
Context

Use cases

The work AI colleagues do

Each does one job, and one of your people approves it. Pick your industry to see who fits.

Construction

Take-off

Radiators, valves, fittings and pipe runs counted and measured on the drawings, each number linked to its sheet.
Construction

Spec and BoQ check

The client’s bill checked against the drawings and the technical report, with a drafted question for the client.
Construction

Submittal review

Supplier data sheets compared with what the technical report requires, with a drafted comment per deviation.
Construction

Bid inbox

Invitations, addenda, questions and quotes filed to the right tender, with the next step drafted for approval.
Construction

Service renewals

Service agreements due for renewal found, notice deadlines worked out and the renewal quote drafted.
Oil & Gas · Construction

P&ID take-off

Valves, instruments, equipment and line numbers counted on every P&ID, each item linked to its sheet.
Energy · Construction

Revision control

Each new issue of a drawing compared with the last one, every change shown before and after.
Construction · Oil & Gas

Turnover registers

Line lists, tag registers and drawing indexes handed over as data, traceable tag by tag to the sheets.
Every industry

Ask

Questions answered across drawings, documents and e-mail, each answer citing the sheet and its revision.
Energy · Manufacturing

Brownfield register

Old scanned sheets turned into an equipment register before the walkdown, with what needs checking on site.
Chemical · Oil & Gas

MOC package

Everything a plant change touches gathered into one package, with the gaps listed before it closes.
Oil & Gas · Chemical

LDAR coverage

The P&IDs compared with the leak-measurement register: missing, extra and mismatched components, with evidence.
Chemical · Oil & Gas

HAZOP preparation

Nodes and every change on the P&IDs since the last study, prepared for the HAZOP team.
Chemical

Safety documentation

P&IDs, the equipment register and relief valve records kept consistent, with every gap listed.
Manufacturing · Energy

Work orders from trends

Readings from the control system checked against your rules, with a draft work order when one is due.

Send us one set of drawings. We’ll show you what we find.

One set of drawings is enough to start. Martin Studna, co-founder, is your contact.

Send drawings

Add your name.

Add an email we can reply to.

Add your company.

When

Used only to reply to this request.

Request sent

We will reply soon.