Use casesChemical
MOC package
Everything a plant change touches gathered into one management of change package: drawings and revisions, HAZOP nodes, related e-mail, and what is missing.

01
Summary
Every change to a running plant needs its paperwork: the drawings that must be reissued, the nodes of the safety study it touches, the open recommendations, the e-mail in which it was agreed. Collecting it by hand takes days, and a change closed with a gap in it shows up at the next audit.
The MOC package colleague reads each MOC record, finds the P&ID issues and the revision it requires, the HAZOP nodes that hold its tags and lines, and the e-mail that names it. Gaps become findings: a revision not yet issued, a tag on no drawing, a closed change still missing its checks. On the sample plant: 5 MOCs, 23 items, 1 gap.
02
Inputs and outputs
What goes in
- The MOC register and its records
- Every issue of the P&IDs
- The HAZOP study and its node table
- Recommendations and their status
- E-mail that names the MOC or its tags
What comes out
- A package per MOC: tags, drawings, nodes
- The revision each drawing must reach
- Related e-mail, attached
- Gaps, each as a finding
- A change package in PDF
03
How it runs
Step
AI colleague
Your team
01
Read the MOC
Reads each MOC record for the tags and documents it names, and the revision that must be issued.
Keeps the MOC register as before.
02
Gather the package
Collects the P&ID changes the MOC names, the HAZOP nodes that hold its items and the e-mail about it.
Opens any item in the package.
03
List the gaps
Reports a revision not issued, a tag on no drawing, or a closed MOC with an open recommendation.
Decides how each gap is closed.
04
Approve and issue
Prepares the package and stops until a named approver releases it.
Your safety engineer releases it.
04
What changes
Task
Today
With Kintric Context
Collecting the package
Days of searching before each audit
Gathered from the records it names
Required revisions
Checked when someone remembers
Compared with the issued revision
Closing a change
Gaps found at the next audit
Gaps listed before it closes
Related e-mail
Somewhere in someone’s inbox
Attached to the package
05
Checks built in
Only the changes the MOC names
Changes outside the MOC record stay out of its package.
Moved is not changed
A symbol that only moved is a drafting change, as the plant’s rules say.
Gaps are findings
A missing revision or review is reported, never assumed.
06
Getting started
Send us your MOC register with the P&ID issues and the last HAZOP study of one unit. We build the packages and go through the gaps with you.
Martin Studna, co-founder, is your contact.
Send drawings- The MOC register of one unit
- Its P&IDs, every issue
- The last HAZOP study
MOC package · a finished run
Every change, with its paperwork.
On the sample plant: 5 MOCs, 23 package items, 2 related e-mails and 1 gap found.

MOC package· Riverside wastewater plantAwaiting approval
5 MOCs: 23 package items, 1 gap, 2 related e-mails
5MOCs
23items
1gap
2e-mails
MOC-2023-003 · the package must include
- PT-102TagP&ID-101
- U-02HAZOP nodeStudy, node table
- MOC-2026-002P&ID-101 rev. 4 not issued yetrev. 3 is currentGap
Related use cases

HAZOP preparation
Nodes and every change on the P&IDs since the last study, prepared for the HAZOP team.
Revision control
Each new issue of a drawing compared with the last one, every change shown before and after.
Safety documentation
P&IDs, the equipment register and relief valve records kept consistent, with every gap listed.Further reading

One water treatment plant, read in 92 seconds
The drawings, the equipment table on sheet D.2.1.2 and the bill, and where they disagree.Watch the film
What happens to your documents
Where the current build runs, and why your documents are not used to train models.Read more
Send us one set of drawings. We’ll show you what we find.
One set of drawings is enough to start. Martin Studna, co-founder, is your contact.