Revision control
Each new issue of a drawing compared with the one before it, every added, changed or moved item shown on both issues, before anyone works from the new sheet.

01
Summary
Drawings are reissued all the time: a valve added, a line renumbered, a size changed. The revision cloud does not always show everything, and the person who knew the old issue may be away. A change nobody noticed is then built, priced or maintained the old way.
The Revision control colleague compares every new issue of a sheet with the last one and lists each difference with evidence from both issues. On P&IDs it also compares the tags and the line numbers, and documents the client republished are compared line by line. On the sample plant it found 9 changes in 2 pairs of sheets.
02
Inputs and outputs
What goes in
- Each issue of every sheet
- P&IDs and their tag lists
- Specifications that were reissued
- Revision numbers and dates
- The take-off of the last issue
What comes out
- Added, removed and changed items
- Lines renumbered or resized
- Symbols that only moved, kept apart
- A report in Excel and PDF
- Both issues cited for every change
03
How it runs
Step
AI colleague
Your team
01
Pair the issues
Finds the previous issue of each sheet and document and pairs it with the new one.
Uploads the new issue as received.
02
Compare
Compares the drawings and, on P&IDs, the tags and line numbers; documents are compared line by line.
Opens any change on both issues.
03
Sort the changes
Separates real changes from symbols that only moved on the sheet, and lists each with its evidence.
Decides what each change means.
04
Approve and issue
Prepares the report and stops. Nothing is issued until a named approver releases it.
Your process engineer releases it.
04
What changes
Task
Today
With Kintric Context
Finding changes
Clouds and memory
Every item compared, issue to issue
Renumbered lines
Easy to miss on a busy sheet
Listed with the old and new number
Checking a change
Two printouts side by side
Both issues cited for every change
Reissued documents
Read again from the start
Compared line by line
05
Checks built in
Moved symbols kept apart from changes
A symbol that only moved is listed as a drafting change.
Both issues cited
Every change names the old and the new issue it came from.
Tags and lines compared
On P&IDs the tag and line lists are compared, not only the picture.
06
Getting started
Send us two issues of the same set of drawings. We run the comparison and go through every change with the person who controls your documents.
Martin Studna, co-founder, is your contact.
Send drawings- Two issues of the same drawings
- The documents reissued with them
- Your own list of changes, for comparison
Revision control · a finished run
Every change, before and after.
On the sample plant: 9 changes in 2 pairs of P&IDs, among them a valve added and a line renumbered.

Revision control· Riverside wastewater plantAwaiting approval
9 findings from 9 differences in 2 sheet pairs
9changes
2sheet pairs
2moved only
Changes between issues
- HV-108Hand valveP&ID-101 rev. 3 vs rev. 2Added
- 150-SL-1006-A1Line, was 100-SL-1006-A1P&ID-101 rev. 3 vs rev. 2Changed
- PT-102Pressure instrumentP&ID-101 rev. 3 vs rev. 2Moved
Related use cases

P&ID take-off
Valves, instruments, equipment and line numbers counted on every P&ID, each item linked to its sheet.
HAZOP preparation
Nodes and every change on the P&IDs since the last study, prepared for the HAZOP team.
MOC package
Everything a plant change touches gathered into one package, with the gaps listed before it closes.Further reading

One water treatment plant, read in 92 seconds
The drawings, the equipment table on sheet D.2.1.2 and the bill, and where they disagree.Watch the film
What happens to your documents
Where the current build runs, and why your documents are not used to train models.Read more
Send us one set of drawings. We’ll show you what we find.
One set of drawings is enough to start. Martin Studna, co-founder, is your contact.