HAZOP preparation
Everything that changed on the P&IDs since the last HAZOP study, with the node list, the changes made under MOC and the open recommendations, ready for the team.

01
Summary
Before a HAZOP revalidation someone has to find out what changed since the last study: new valves, renumbered lines, changes made under MOC, recommendations still open. It takes days of comparing the drawings with the old study, and something is still found in the meeting.
The HAZOP preparation colleague reads the study’s own basis, compares each P&ID issue it used with the current one and lists what is new, modified or removed; symbols that only moved are kept apart. It adds the MOCs started since and the open recommendations. On the sample plant: 4 new items, 2 modified.
02
Inputs and outputs
What goes in
- The last HAZOP study and its node table
- The P&ID issues the study was based on
- The current issue of every P&ID
- The MOC register
- Recommendations and their status
What comes out
- New, modified and removed items
- Renumbered lines under their new numbers
- MOCs started since the study
- Open recommendations
- A HAZOP pack in Excel and PDF
03
How it runs
Step
AI colleague
Your team
01
Find the basis
Reads the study’s date and the P&ID issues it was based on from the study itself.
Sends the last study as it is.
02
Compare the issues
Compares each basis issue with the current one: new, modified and removed items, moved symbols apart.
Opens any change on both issues.
03
Prepare the nodes
Reuses the study’s node table, maps renumbered lines and proposes a node for every new item.
Checks the proposed nodes.
04
Approve and issue
Prepares the HAZOP pack and stops until a named approver releases it.
Your safety engineer releases it.
04
What changes
Task
Today
With Kintric Context
Finding what changed
Days of comparing drawings
Every basis issue compared with today
Renumbered lines
Lost between the old and new issue
Mapped to their new numbers
New items
Placed in a node in the meeting
A node proposed for each
Open recommendations
Looked up separately
Listed in the pack
05
Checks built in
Drafting changes kept apart
Symbols that only moved are listed, not reported as changes.
The study’s own basis
Changes are counted from the issues the study used.
MOCs since the study
Changes made under MOC after the study date are listed.
06
Getting started
Send us your last HAZOP study and the P&IDs of the unit, every issue since. We prepare the pack and go through the changes with your team.
Martin Studna, co-founder, is your contact.
Send drawings- The last HAZOP study with its node table
- The P&IDs, every issue since the study
- Your MOC register
HAZOP preparation · a finished run
What changed since the last study.
On the sample plant: 4 new and 2 modified items, 4 MOCs and 5 open recommendations since the study.

HAZOP preparation· Riverside wastewater plantAwaiting approval
Since the HAZOP study: 4 new, 2 modified, 0 removed items; 4 MOCs; 5 open recommendations
4new
2modified
4MOCs
5open
Since the study
- HV-108Hand valve, not in the studyP&ID-101 rev. 3New
- 150-SL-1006-A1Was 100-SL-1006-A1P&ID-101 rev. 3Changed
- PSV-202Safety valve, not in the studyP&ID-201 rev. 2New
Related use cases

MOC package
Everything a plant change touches gathered into one package, with the gaps listed before it closes.
Revision control
Each new issue of a drawing compared with the last one, every change shown before and after.
LDAR coverage
The P&IDs compared with the leak-measurement register: missing, extra and mismatched components, with evidence.Further reading

One water treatment plant, read in 92 seconds
The drawings, the equipment table on sheet D.2.1.2 and the bill, and where they disagree.Watch the film
What happens to your documents
Where the current build runs, and why your documents are not used to train models.Read more
Send us one set of drawings. We’ll show you what we find.
One set of drawings is enough to start. Martin Studna, co-founder, is your contact.