NewAI colleagues set up for your company, live in four weeks. On average, what we deploy saves €2.5M a year.€2.5M saved a year, on averageHow we deploy →
Context

Use casesOil & Gas

LDAR coverage

The components in leak-measurement scope drafted from the current P&IDs and reconciled with your LDAR register: what is missing, what is extra, what does not match.

Works with
Safety and environmental engineers responsible for LDAR
Starts from
The current P&IDs and the LDAR register with its rules
Delivers
Missing, extra and mismatched entries, with evidence

01

Summary

A leak detection and repair programme is only as good as its register. Components get added on the drawings and never reach the register, entries stay for valves removed long ago, and the gap shows up in an audit rather than in a measurement round.

The LDAR coverage colleague takes the scope from your register’s own rules, gives every tag on the current P&IDs a service from the equipment register or the nearest line, and compares both ways. Each missing, extra or mismatched entry carries evidence from both sides. On the sample plant: 13 components in scope, 2 missing, 1 extra, 3 mismatches.

02

Inputs and outputs

What goes in

  • The current issue of every P&ID
  • The LDAR register and its scope rules
  • The equipment register and media
  • Line numbers and their services
  • Older issues the register still uses

What comes out

  • Components in scope, drafted from the P&IDs
  • Components missing from the register
  • Register entries on no current P&ID
  • Mismatched lines and component types
  • An updated register draft in Excel

03

How it runs

Step

AI colleague

Your team

01

Set the scope

Reads the scope from the register’s own rules sheet: for example gas service in, liquids and air out.

Confirms the rules sheet is current.

02

Draft the list

Gives every tag on the current P&IDs a service, from the equipment register or the nearest line number.

Opens any component on its sheet.

03

Reconcile

Compares the list with the register both ways and lists missing, extra and mismatched entries.

Decides how each entry is fixed.

04

Approve the update

Drafts the register update and stops until a named approver releases it.

Your safety engineer releases it.

04

What changes

Task

Today

With Kintric Context

The register

Updated after an audit finds a gap

Checked against the current P&IDs

Missing components

Found in the field, or not at all

Listed with the sheet that shows them

Old entries

Measured, though long removed

Flagged when no P&ID shows the tag

Evidence

Notes on a printout

Both sides cited for every entry

05

Checks built in

Scope from your own rules

What counts as in scope comes from your register’s rules sheet.

Both directions

Missing from the register and extra in it, each listed.

Evidence on both sides

Every entry cites the P&ID issue and the register row.

06

Getting started

Send us ten to thirty P&IDs of one unit and its LDAR register. We reconcile them and go through every missing and extra entry with you.

Martin Studna, co-founder, is your contact.

Send drawings
  • The current P&IDs of one unit
  • The LDAR register with its scope rules
  • Your last audit findings, for comparison

LDAR coverage · a finished run

The register, checked against the P&IDs.

On the sample plant: 13 components in scope, 16 register entries, 2 missing, 1 extra and 3 mismatches.

Send us one set of drawings. We’ll show you what we find.

One set of drawings is enough to start. Martin Studna, co-founder, is your contact.

Send drawings

Add your name.

Add an email we can reply to.

Add your company.

When

Used only to reply to this request.

Request sent

We will reply soon.