NewAI colleagues set up for your company, live in four weeks. On average, what we deploy saves €2.5M a year.€2.5M saved a year, on averageHow we deploy →
Context

Every P&ID tag in one register.

Kintric Context reads the P&IDs of a plant once and keeps them. Valves, instruments, equipment and line numbers become one register your engineers check the leak survey, the change records and every new issue against.

The skid, item by item

Every tag on the P&ID is an entry in the plant’s register.

An example separator skid as its P&IDs describe it: the separator with its water boot, the gas scrubber, two in-line pumps, the air cooler, and the valves and instruments between them, each one an entry in the register with the sheet it was read from. Hover any item.

V-201V-202E-104
Example unit · separator skid2 vessels · 2 pumps · 1 air cooler · hover any item

The work today

What plant engineers in oil and gas keep up by hand

  1. 01

    Registers that drift from the drawings

    Valves are replaced and instruments added in the plant, and the P&IDs catch up later or not at all. The register and the drawing then describe two different plants, and nobody can say which of the two is right.

  2. 02

    Leak surveys against old sheets

    The leak survey lists the components in scope. When the drawings change and the list does not, components are missed, or measured where they no longer exist.

  3. 03

    Changes that touch more than they say

    A change package names the line it changes. What else it touches on the drawings, in the registers and in the safety studies is found by reading.

  4. 04

    Reissues compared by eye

    A new issue of a sheet is laid next to the last one. Moved tags, renamed lines and removed valves are easy to miss in a set of hundreds of sheets.

What the colleagues do

P&ID take-off

Counted, not sampled.

Valves, in-line items, instruments, equipment and line numbers counted on every P&ID of the set, each linked to its sheet. On the demo’s reference P&ID: 16 valves, 35 instruments, 33 equipment and 24 line numbers on 36 sheets.

Drawn and scanned P&IDs as they are, and DEXPI files read as data.

Every item opens on the drawing at the place it was read.

What it cannot read with confidence goes to a person and stays out of the totals.

See how it works

LDAR coverage

The survey list, against the P&IDs.

The components in scope on the current P&IDs are compared with the leak-measurement register. Missing, extra and mismatched entries are listed, each with its drawing and its register row.

What is in scope comes from the current issue of the P&IDs.

Missing, extra and mismatched entries, by tag.

The register change is drafted and waits for a named approver.

See how it works

Revision control

Each issue against the last.

A new issue of a sheet is compared with the previous one. Added, changed and moved tags and lines come with evidence from both issues, so a change can be checked instead of searched for.

Each new sheet is matched with its previous issue.

Every change shows the place on the old and the new sheet.

Ready for review, and for approval before it is issued.

See how it works

MOC package

What a change touches.

For each change, the colleague gathers the sheets, register entries and studies it touches, and lists what the package is still missing. The package waits for a named approver.

Sheets, registers and studies that name the changed items.

What a complete package still needs, item by item.

Nothing leaves before a named person releases it.

See how it works

Documents we read

P&IDs DEXPI files Isometrics Equipment tables Line lists Registers Leak survey lists Change records HAZOP studies Data sheets Technical reports Bills of quantities E-mail

What changes

  • Every sheetread, from the first to the last, not a sample
  • Every itemlinked to the sheet and the place it was read
  • Per tagone entry, checked against every register it is in
  • Signedby a named engineer before anything leaves

Questions we hear

Yes. Drawn and scanned PDFs are read as they are. What cannot be read with confidence becomes a question for a person and stays out of the totals.

No. It lists the differences and drafts the update; a named person approves before anything is issued.

P&IDs as PDF or DEXPI XML, and registers, studies and change records as spreadsheets. It hands back Excel and PDF files.

Send us one set of drawings. We’ll show you what we find.

One set of drawings is enough to start. Martin Studna, co-founder, is your contact.

Add your name.

Add an email we can reply to.

Add your company.

When

Used only to reply to this request.

Request sent

We will reply soon.