NewAI colleagues set up for your company, live in four weeks. On average, what we deploy saves €2.5M a year.€2.5M saved a year, on averageHow we deploy →
Context

Use casesChemical

Safety documentation

P&IDs, the equipment register, relief device records and change control kept consistent for major-accident prevention, every gap listed with its evidence.

Works with
Safety engineers at sites under major-accident rules
Starts from
The current P&IDs and the equipment and relief registers
Delivers
A list of inconsistencies, each with its evidence

01

Summary

Sites under major-accident rules must keep their safety documentation consistent: the equipment drawn on the P&IDs, the equipment register, the relief devices and their tests, and the change records. Each sits with a different person, and the gaps between them show up in an inspection.

The Safety documentation colleague checks them against each other: equipment both ways, every relief device against its record, set pressures against the design pressure of what they protect, tests against their interval, and changes against the MOC register. On the sample plant it found a relief valve set above its vessel’s design pressure.

02

Inputs and outputs

What goes in

  • The current issue of every P&ID
  • The equipment register
  • The relief device register
  • Test dates and intervals
  • The MOC register

What comes out

  • Equipment missing from the register
  • Relief devices without a record
  • Set pressures above design pressure
  • Tests past their due date
  • Changes made without an MOC

03

How it runs

Step

AI colleague

Your team

01

Match the equipment

Compares the equipment drawn on the current P&IDs with the equipment register, in both directions.

Sends the registers as they are kept.

02

Check relief devices

Checks each relief device for a record, its set pressure against the design pressure, and its last test.

Opens any finding with its sources.

03

Check the changes

Matches each change between the last two issues with the MOC register, and each MOC with its revision.

Decides how each gap is closed.

04

Approve the update

Prepares the updated documentation and stops until a named approver releases it.

Your safety engineer releases it.

04

What changes

Task

Today

With Kintric Context

Consistency

Checked before an inspection

Checked across every register at once

Relief devices

Records kept apart from the drawings

Every device matched to its record

Units

mbar against bar, by hand

Converted before every comparison

Changes

Found later, without paperwork

Matched to the MOC register

05

Checks built in

Units read from the workbook

Pressures are compared after reading each unit column itself.

Both directions

Equipment missing from the register, and extra in it.

Tests against intervals

Each last test plus its interval is checked against the date.

06

Getting started

Send us the P&IDs of one unit with its equipment and relief registers. We check them against each other and go through every gap with you.

Martin Studna, co-founder, is your contact.

Send drawings
  • The current P&IDs of one unit
  • The equipment and relief device registers
  • Your MOC register

Safety documentation · a finished run

Every gap, with its evidence.

On the sample plant: a relief valve set above its vessel’s design pressure, and a test 140 days overdue.

Send us one set of drawings. We’ll show you what we find.

One set of drawings is enough to start. Martin Studna, co-founder, is your contact.

Send drawings

Add your name.

Add an email we can reply to.

Add your company.

When

Used only to reply to this request.

Request sent

We will reply soon.