Submittal review

Each supplier’s data sheet compared with what the technical report requires, value by value and unit by unit, with a drafted comment for every deviation.

Works with
Project managers and engineers at building services contractors
Starts from
Supplier data sheets and the project’s technical report
Delivers
A comment per deviation, ready to send to the supplier

01

Summary

Before a product is ordered, someone checks the supplier’s data sheet against what the project asks for: airflow, pressure, noise, power, protection class. The values sit in different units in different places, and one missed limit means a unit that does not comply, found when it is already on site.

The Submittal review colleague reads each data sheet, pairs it with the requirements for that product in the technical report and compares every value after converting units. Where a value misses the requirement, it drafts the comment to the supplier. On one school project it checked 6 data sheets and found 4 deviations and 1 missing value.

02

Inputs and outputs

What goes in

  • Supplier data sheets, as PDF files
  • The technical report’s requirements
  • Product designations from the report
  • Values in the supplier’s own units
  • Minimum, maximum and range limits

What comes out

  • Each requirement marked as met or not
  • Deviations, with the required and offered value
  • Values the data sheet does not state
  • A drafted comment per deviation
  • A review in PDF for the supplier

03

How it runs

Step

AI colleague

Your team

01

Read the data sheet

Rebuilds the parameter table of each data sheet from the PDF text and leaves out watermarks and overlays.

Sends the data sheets as received.

02

Pair and compare

Pairs each data sheet with its product’s requirements and compares every value after converting units, such as l/s to m³/h.

Opens any value with both of its sources.

03

Draft comments

Writes a comment for each deviation and lists every value the data sheet does not state.

Edits the comments where needed.

04

Approve and send

Prepares the review and stops. Nothing goes to the supplier until a named approver releases it.

Your project manager releases it by name.

04

What changes

Task

Today

With Kintric Context

A data sheet

Read line by line against the report

Every value compared, units converted

Units

Converted by hand, one at a time

l/s, m³/h, kPa and Pa compared

Missing values

Easy to overlook

Listed as findings of their own

The supplier’s answer

Written from scratch

A drafted comment per deviation

05

Checks built in

Limits read from your report

Minimum, maximum and ranges come from the report’s own wording.

Units converted

Values are compared after conversion, never as written.

Missing is a finding

A value the data sheet leaves out is listed, not assumed.

06

Getting started

Send us the technical report and the data sheets of one project. We run the review on them and go through each deviation with you.

Martin Studna, co-founder, is your contact.

Send drawings
  • The technical report with product requirements
  • The supplier data sheets, as PDF files
  • Your own comments on them, for comparison

Submittal review · a finished run

One comment for every deviation.

On a school project: 6 data sheets checked, 4 deviations and 1 missing value, each with a comment.

Send us one set of drawings. We’ll show you what we find.

One set of drawings is enough to start. Martin Studna, co-founder, is your contact.

Send drawings

Add your name.

Add an email we can reply to.

Add your company.

When

Used only to reply to this request.

Request sent

We will reply soon.