NewAI colleagues set up for your company, live in four weeks. On average, what we deploy saves €2.5M a year.€2.5M saved a year, on averageHow we deploy →
Context

Use casesConstruction

Spec and BoQ check

The client’s bill of quantities checked line by line against the drawings, the equipment tables and the technical report, with each difference and its sources.

Works with
Estimators and heads of bids at building services contractors
Starts from
The client’s bill, the drawings and the technical report
Delivers
A list of findings and a drafted question for the client

01

Summary

A tender package comes from several hands. The bill of quantities is priced as it stands, yet it often disagrees with the drawings and the technical report: a quantity that does not match, an item that is missing, a sheet that is not what its title says. Found after the price is fixed, each one costs money.

The Spec and BoQ check colleague compares every bill line with the items on the drawings, the equipment tables on the sheets and the requirements in the technical report. Each difference becomes a finding with both sources attached. On a school tender it found 83, among them 24 quantity differences and a missing floor plan.

02

Inputs and outputs

What goes in

  • The client’s bill of quantities
  • The drawings, with their legends
  • Equipment tables drawn on the sheets
  • The technical report
  • A revised bill, when the client issues one

What comes out

  • Quantity differences, line by line
  • Missing and extra items
  • Conflicts with the technical report
  • A drafted request for clarification
  • A check report in Excel, with every source

03

How it runs

Step

AI colleague

Your team

01

Pair the lines

Matches each bill line to the items on the drawings and in the tables, comparing names, sizes and units.

Sends the bill as received.

02

Compare

Counts must agree exactly and lengths within 5 %. Each difference is listed with the bill line and the sheet beside it.

Opens any finding with both of its sources.

03

Draft the question

Writes the request for clarification, one point for each finding that needs the client’s answer.

Edits the wording where needed.

04

Approve and send

Prepares the report and the drafted e-mail and stops. Nothing is sent until a named approver releases it.

Your head of bids releases it by name.

04

What changes

Task

Today

With Kintric Context

The bill

Priced as it stands

Each line checked against the drawings

Differences

Found on site, after the price is fixed

Shown with both sources before pricing

The question

Written by hand under the deadline

Drafted, one point per finding

A revised bill

Compared again by eye

Compared with the last issue

05

Checks built in

Exact counts, lengths within 5 %

Counts must agree exactly; a length may differ by up to 5 %.

Both sources attached

Every finding cites the bill line and the sheet it was compared with.

Sizes read as one

DN 25 and d25 are the same size; metres and pieces are kept apart.

06

Getting started

Send us the bill and the drawings of one tender you have already priced. We run the check on them and go through every finding with you.

Martin Studna, co-founder, is your contact.

Send drawings
  • The client’s bill of quantities, as a spreadsheet
  • The drawings and the technical report
  • The questions you sent the client, if any

Spec and BoQ check · a finished run

It drafts the question for the client.

On a school tender: 83 findings, 24 quantity differences and a floor plan missing from the package.

Send us one set of drawings. We’ll show you what we find.

One set of drawings is enough to start. Martin Studna, co-founder, is your contact.

Send drawings

Add your name.

Add an email we can reply to.

Add your company.

When

Used only to reply to this request.

Request sent

We will reply soon.