Use casesConstruction
Turnover registers
The line list, the tag register and the drawing index handed over as data at the end of a project, each tag traceable to every sheet it appears on.

01
Summary
At handover the owner expects registers: every line with its size and service, every tag with its data, every drawing with its revision. They are usually typed up from the drawings at the end of a project, when the people who know the plant best are already moving on.
The Turnover registers colleague builds them from the latest issue of every sheet and the equipment register. Each tag is listed with its register data and every sheet it appears on, so the owner can trace it back. On the public DEXPI test set it prepared 75 tags, 24 lines and an index of 38 sheets.
02
Inputs and outputs
What goes in
- The latest issue of every sheet
- Corrections made during review
- The equipment register
- Line numbers and their services
- Sheet titles, revisions and dates
What comes out
- A line list with size and service
- A tag register with each tag’s sheets
- A drawing index with revisions
- Excel, PDF, JSON and DEXPI XML files
- A trace from every tag to its sheets
03
How it runs
Step
AI colleague
Your team
01
Collect the sheets
Takes the latest issue of every sheet, with the corrections people made during review.
Confirms the set is final.
02
Build the registers
Builds the line list, the tag register and the drawing index, and fills each tag from the equipment register.
Checks the register data.
03
Trace every tag
Lists every sheet each tag appears on, so any entry can be followed back to its drawings.
Opens any tag on its sheets.
04
Approve and hand over
Exports the registers in Excel, PDF, JSON and DEXPI XML and stops until a named approver releases them.
Your process engineer releases them.
04
What changes
Task
Today
With Kintric Context
Building registers
Typed up at the end of the project
Built from the latest sheets
Tracing a tag
Search the drawing set by hand
Every sheet listed beside the tag
Formats
A spreadsheet the owner retypes
Excel, PDF, JSON and DEXPI XML
Late corrections
Copied into each register again
Carried over from review
05
Checks built in
Built from the latest issue only
Older issues of a sheet never feed the registers.
Corrections kept
Changes people made during review carry into every register.
Traceable tag by tag
Each tag lists the sheets it appears on, with their revisions.
06
Getting started
Send us the final drawings of one finished project with its equipment register. We build the registers and go through them with you.
Martin Studna, co-founder, is your contact.
Send drawings- The final issue of the drawings
- The equipment register
- The registers you handed over, for comparison
Turnover registers · a finished run
Registers handed over as data.
On the public DEXPI test set: 75 tags, 24 lines and an index of 38 sheets, ready to hand over.

Turnover registers· DEXPI test setAwaiting approval
75 tags, 24 lines and an index of 38 sheets to hand over
75tags
24lines
38sheets
Outputs · draft
Hand over the registers
Related use cases

P&ID take-off
Valves, instruments, equipment and line numbers counted on every P&ID, each item linked to its sheet.
Revision control
Each new issue of a drawing compared with the last one, every change shown before and after.
Brownfield register
Old scanned sheets turned into an equipment register before the walkdown, with what needs checking on site.Further reading

One water treatment plant, read in 92 seconds
The drawings, the equipment table on sheet D.2.1.2 and the bill, and where they disagree.Watch the film
How a pilot runs on one set of drawings
Send one real package as you have it. The colleagues read it; your engineer decides.Read more
Send us one set of drawings. We’ll show you what we find.
One set of drawings is enough to start. Martin Studna, co-founder, is your contact.