Use casesConstruction

Turnover registers

The line list, the tag register and the drawing index handed over as data at the end of a project, each tag traceable to every sheet it appears on.

Works with
Project engineers and document controllers at handover
Starts from
The latest issue of every sheet and the equipment register
Delivers
Handover registers in Excel, PDF and DEXPI XML

01

Summary

At handover the owner expects registers: every line with its size and service, every tag with its data, every drawing with its revision. They are usually typed up from the drawings at the end of a project, when the people who know the plant best are already moving on.

The Turnover registers colleague builds them from the latest issue of every sheet and the equipment register. Each tag is listed with its register data and every sheet it appears on, so the owner can trace it back. On the public DEXPI test set it prepared 75 tags, 24 lines and an index of 38 sheets.

02

Inputs and outputs

What goes in

  • The latest issue of every sheet
  • Corrections made during review
  • The equipment register
  • Line numbers and their services
  • Sheet titles, revisions and dates

What comes out

  • A line list with size and service
  • A tag register with each tag’s sheets
  • A drawing index with revisions
  • Excel, PDF, JSON and DEXPI XML files
  • A trace from every tag to its sheets

03

How it runs

Step

AI colleague

Your team

01

Collect the sheets

Takes the latest issue of every sheet, with the corrections people made during review.

Confirms the set is final.

02

Build the registers

Builds the line list, the tag register and the drawing index, and fills each tag from the equipment register.

Checks the register data.

03

Trace every tag

Lists every sheet each tag appears on, so any entry can be followed back to its drawings.

Opens any tag on its sheets.

04

Approve and hand over

Exports the registers in Excel, PDF, JSON and DEXPI XML and stops until a named approver releases them.

Your process engineer releases them.

04

What changes

Task

Today

With Kintric Context

Building registers

Typed up at the end of the project

Built from the latest sheets

Tracing a tag

Search the drawing set by hand

Every sheet listed beside the tag

Formats

A spreadsheet the owner retypes

Excel, PDF, JSON and DEXPI XML

Late corrections

Copied into each register again

Carried over from review

05

Checks built in

Built from the latest issue only

Older issues of a sheet never feed the registers.

Corrections kept

Changes people made during review carry into every register.

Traceable tag by tag

Each tag lists the sheets it appears on, with their revisions.

06

Getting started

Send us the final drawings of one finished project with its equipment register. We build the registers and go through them with you.

Martin Studna, co-founder, is your contact.

Send drawings
  • The final issue of the drawings
  • The equipment register
  • The registers you handed over, for comparison

Turnover registers · a finished run

Registers handed over as data.

On the public DEXPI test set: 75 tags, 24 lines and an index of 38 sheets, ready to hand over.

Send us one set of drawings. We’ll show you what we find.

One set of drawings is enough to start. Martin Studna, co-founder, is your contact.

Send drawings

Add your name.

Add an email we can reply to.

Add your company.

When

Used only to reply to this request.

Request sent

We will reply soon.